Studley AI Review: The Best Study Tool in 2026?

-

Studley AI caught my eye at a time when I was searching for a smarter way to study. I often find myself buried under notes, lectures, and endless reading. So when I saw that Studley claims to turn any study material into flashcards, quizzes, summaries, and even mini lessons, I was curious right away. It felt like the kind of tool that could save me hours of work. And because I love trying new things that make learning easier, I decided to try it myself and share my experience in the simplest and most honest way.

This review shares everything I experienced so anyone reading this can make an informed decision without needing to search for anything else.

What Studley AI Actually Is

Studley.ai title screen with graduation cap icon

Studley AI is basically a study assistant that can take any type of information you give it and turn it into different learning formats. You do not need to know anything about technology to use it. You simply upload your study material and Studley creates:

  • Flashcards
  • Multiple choice questions
  • Fill in the blanks
  • Tutor explanations
  • Written tests
  • Summary notes

This means Studley does the heavy lifting. You do not have to make your own flashcards or questions. It saves a lot of time and lets you focus on learning instead of preparing.

I personally found this very useful because creating study material manually takes hours. Studley cuts that down to a few seconds.

Uploading Materials: Almost Every Format Works

Study dashboard showing sets and mastery progress levels

One of the best things about Studley.ai is that it supports almost every type of input. You can upload:

  • PDF files
  • Audio files
  • Text input
  • YouTube video links
  • Website links
  • Record Your Lecture

This covers almost every possible study material a student normally uses.

I even tried uploading a video file, but it did not work for me. This might be fixed in future updates, but as of now video uploading is not reliable. Still, the number of supported inputs is impressive. You can basically feed it any form of information and Studley will process it.

Once you upload the file, Studley reads the content, understands it, and creates multiple types of learning formats based on the information inside. This is one of the strongest features because it saves you time and creates structure from messy notes.

Studley AI Creates Different Learning Formats Instantly

opup menu offering various study content formats

Every time you upload something new, Studley.ai creates a study set. Think of a study set as a folder that contains all your learning tools in one place.

A study set includes:

Flashcards

These have a question on one side and the answer on the other.
You flip the card and then mark whether you knew the answer or not.
This helps Studley track what you are learning well and what needs more work.

Multiple Choice Questions

These are helpful when you want quick revision.
Studley generates options, and you select the correct one.

Fill in the Blanks

You get a sentence with a missing word, and you must type the answer.
This forces you to recall information without guessing.

Written Tests

These are descriptive questions where you type long answers in your own words.
Studley checks if your answer is relevant, even if it is not exact word to word.
This is great practice for actual exams.

Tutor Lessons

This is like getting a bite sized explanation of all the topics.
Studley explains concepts in simple language and adds examples.
On the right side, you can also type questions if you want extra help.

Notes

This is a summarized version of everything you uploaded.
You can also edit, add, or remove anything in the summary, which gives you full control.

This combination makes each study set powerful and complete. You can choose the format that matches your learning style or even use all of them.

Your Progress Tracking System In Studley.ai

Learning progress chart showing unfamiliar study items count

Studley.ai tracks your progress using four simple categories. Every question starts in:

  • Unfamiliar
  • Learning
  • Familiar
  • Mastered

At the start, everything is in the Unfamiliar category. When you answer a question correctly, it moves up levels. If you get everything correct in a study set, your progress bar increases.

Important to know

You have to finish all the questions in one go.
If you close or leave in between, you must answer everything again.
This can be frustrating and it is one of the clear cons.

On the positive side, your questions are divided into subtopics. This means if you only want to practice a specific chapter or topic, you can filter and focus on that alone. This level of control helps you revise smarter.

Extra Features You Should Know About

Voice selection screen featuring various celebrity-style icons

Studley comes with a few additional sections that go beyond normal studying.

1. Podcast Mode

Studley has a podcast feature where you upload a file or text and then listen to it in the voice of famous personalities like Ronaldo, KSI, Elon Musk, and others.

This sounds exciting at first, but the voices do not sound real. They are robotic and do not resemble the original people.
It might be fun to try once, but it is not a feature I used seriously.

2. Solve Section

This is actually useful.
If you have a doubt or a difficult question, you can upload it and Studley will explain the solution.
It is quick and gives clear answers, which helps when you are stuck.

3. Paper Grader

This allows you to upload assignments or essays.
You can also add rubrics, which is basically grading criteria.
Studley reads your work, analyzes it, and gives feedback on how to improve it.
It also gives a grade estimate.

This can be helpful for revising assignments before submitting them. Also, a new quick tutorial has been added to help first-time users understand the UI and its sections more easily.

Studley Subscription Pricing: Important Considerations

Studley does offer a free trial, but it is extremely limited.
You can only create one study set on the free plan.
After that, you cannot create more unless you upgrade.

The paid unlimited plan costs:

  • ≈ $98 per year (for Annual Plan)
  • ≈ $15 per month (for Monthly plan)

In Indian Rupees, this comes to:

  • Around 8500 rupees per year
  • Around 15000 rupees per year for monthly billing

This is expensive for most students, especially in countries with currencies much weaker than the USD.

Note: You can use code YOUTUBE at checkout to get 25% off on the Studley AI Unlimited plan.

My honest opinion about pricing

The tool is worth it only if the study formats match your learning style and you use it regularly. If you are someone who benefits from structured revision, Studley can help a lot.
But the free trial should have at least two or three study sets so students can test it more deeply.

What I Loved About Studley AI

Here are the strongest points of Studley:

  • Supports almost every type of input
  • Creates complete study sets in seconds
  • Flashcards, quizzes, lessons and notes are clear and helpful
  • Progress tracking makes learning structured
  • Subtopic filtering is excellent
  • Notes are editable
  • Solve section is very helpful
  • Paper grader gives useful feedback

These features save time and make learning more active. If you are someone who likes interactive study tools, Studley fits perfectly.

What Studley Needs To Improve

These are areas where Studley falls short:

  • Free plan is too limited
  • You must finish all questions in a study set without closing
  • Video upload did not work for me
  • Pricing is high for many students

These issues do not break the experience, but they are noticeable and should be improved.

Final Verdict: Is Studley AI’s Unlimited Plan Worth It in 2026?

Studley AI is a strong and well designed tool for students who want to study more efficiently. It covers almost every learning format, and it creates everything automatically from your inputs. This makes revision faster and easier.

It is not perfect. The free trial is too limited, the price is high, and some features like podcast mode are not polished. But the core functions like flashcards, quizzes, tutor mode, and written tests are excellent.

If someone is serious about learning and studies regularly, Studley can genuinely make learning more effective.
If someone only studies occasionally or does not like quiz based learning, the price may not feel worth it.

My Rating: 4 out of 5 [⭐️⭐️⭐️⭐️☆]

This score is based on:

  • Strong features
  • Fast processing
  • Wide input support
  • Accurate learning formats

The few flaws keep it from a perfect score, but it is still one of the best study tools I have used.

Amar Roy
Amar Roy
Amar explores the world of Generative AI and experiments with new tools every day. He enjoys finding practical ways to apply AI in real work. Over the past 4 years, he has written more than 3000 articles across various topics. He likes turning complex ideas into simple stories. When he is not writing, he is probably testing the limits of the next AI model.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

More Stories